BIM Services Malaysia

BIM modelling, multidisciplinary coordination and as-built information for architecture, structures, civil and infrastructure, and mechanical, electrical and plumbing systems. Based in Kelantan and Sabah, Malaysia.

BIM service scope

  • Set-up: BIM execution plan, model responsibility matrix, coordinates, naming, exchange formats and review milestones.
  • Production: discipline modelling, drawing extraction, agreed quantity schedules, IFC exchange and object or family authoring.
  • Coordination: model federation, clash rules, issue logs, visual reviews and closure tracking with the appointed team.
  • Project and asset information: optional 4D sequencing, point cloud to BIM, as-built records and asset schedules where specified.

Level of Development (LOD) 100–500

Assign the required LOD to each model element or system in the BIM execution plan and agree what the team can rely on at each milestone.

LOD 100 · Concept

Use massing or symbolic representations for briefing and option studies. Potential outputs include concept views and indicative quantities based on agreed assumptions.

LOD 200 · Schematic

Model generic systems using approximate sizes, quantities and positions. Review layout, broad system routes and space allowances as the design develops.

LOD 300 · Defined design

Model agreed elements with measurable geometry and placement. Typical uses include drawing production, quantities and discipline reviews where specified.

LOD 350 · Interfaces

Develop interfaces with adjacent systems, such as service penetrations, access zones and structural connections, to support construction coordination and clash resolution.

LOD 400 · Fabrication

Provide fabrication or installation detail for items identified in the scope, using approved specialist information and the applicable trade’s responsibility matrix.

LOD 500 · Existing or as-built verification

Record existing or installed conditions against agreed evidence, such as field checks, scans or approved records. Specify tolerances, verification and asset data separately.

Technical reference: BIMForum Level of Development Specification

Scope by project type

Commercial and fit-out

Review tenant layouts, ceiling coordination and service interfaces. Confirm who contributes the interior model and what documentation is needed for the authority submission.

Hospitals and healthcare

Prioritise service routing, ceiling congestion and equipment access in the agreed areas. Specify the disciplines, clearance rules and model exchange dates in the BIM execution plan.

Schools and buildings

Coordinate structural grids, stairs, major openings and service routes. Define architecture, structure and MEP outputs by discipline and milestone.

Infrastructure and existing assets

Agree the coordinate reference, survey limits and tolerances before combining civil, structural or point-cloud data. Identify which assets require verified geometry and handover attributes.