BIM modelling, multidisciplinary coordination and as-built information for architecture, structures, civil and infrastructure, and mechanical, electrical and plumbing systems. Based in Kelantan and Sabah, Malaysia.
BIM service scope
- Set-up: BIM execution plan, model responsibility matrix, coordinates, naming, exchange formats and review milestones.
- Production: discipline modelling, drawing extraction, agreed quantity schedules, IFC exchange and object or family authoring.
- Coordination: model federation, clash rules, issue logs, visual reviews and closure tracking with the appointed team.
- Project and asset information: optional 4D sequencing, point cloud to BIM, as-built records and asset schedules where specified.
Level of Development (LOD) 100–500
Assign the required LOD to each model element or system in the BIM execution plan and agree what the team can rely on at each milestone.
LOD 100 · Concept
Use massing or symbolic representations for briefing and option studies. Potential outputs include concept views and indicative quantities based on agreed assumptions.
LOD 200 · Schematic
Model generic systems using approximate sizes, quantities and positions. Review layout, broad system routes and space allowances as the design develops.
LOD 300 · Defined design
Model agreed elements with measurable geometry and placement. Typical uses include drawing production, quantities and discipline reviews where specified.
LOD 350 · Interfaces
Develop interfaces with adjacent systems, such as service penetrations, access zones and structural connections, to support construction coordination and clash resolution.
LOD 400 · Fabrication
Provide fabrication or installation detail for items identified in the scope, using approved specialist information and the applicable trade’s responsibility matrix.
LOD 500 · Existing or as-built verification
Record existing or installed conditions against agreed evidence, such as field checks, scans or approved records. Specify tolerances, verification and asset data separately.
Technical reference: BIMForum Level of Development Specification
Scope by project type
Commercial and fit-out
Review tenant layouts, ceiling coordination and service interfaces. Confirm who contributes the interior model and what documentation is needed for the authority submission.
Hospitals and healthcare
Prioritise service routing, ceiling congestion and equipment access in the agreed areas. Specify the disciplines, clearance rules and model exchange dates in the BIM execution plan.
Schools and buildings
Coordinate structural grids, stairs, major openings and service routes. Define architecture, structure and MEP outputs by discipline and milestone.
Infrastructure and existing assets
Agree the coordinate reference, survey limits and tolerances before combining civil, structural or point-cloud data. Identify which assets require verified geometry and handover attributes.
Selected BIM projects
- Kuarters Guru SMK Chiku 2 · LOD 300
- Pusat Akuatik SUKMA Kelantan 2028 · LOD 100–200
- PKINK KALA Arkada · LOD 500